Tomorrow’s Tech Treepowered by Astra

Computing · Projected milestone

Gigawatt AI campuses

Estimated year~2027

75% by 2029 · including earlier years

The year is an editorial timing estimate. The percentage applies to occurrence by the stated deadline. These estimates are not calibrated odds.

Single AI training sites draw over a gigawatt of power, the output of a large nuclear reactor.

Explore this milestone on the interactive map

What the forecast means

Milestone stage: deployment

plausible-unconfirmed

A built and energized single-site gigawatt AI campus, as distinct from announced plans.

Completion criteria: Operator and utility or independently audited metering show a sustained 24-hour average above 1 GW at the single campus. Include cooling and support load; proposed capacity, aggregate global sites, short spikes and reserved grid connections do not qualify.

This page describes a forecast, rather than an achieved result. Read the methodology and assumptions.