Fusion pilot power plant

Estimated year~2038

45% by 2045 · including earlier years

The year is an editorial timing estimate. The percentage applies to occurrence by the stated deadline. These estimates are not calibrated odds.

A fusion installation exports at least 1 MWh of net electricity during a continuous 24-hour evaluation, independently metered after all plant imports and explicitly accounting for startup and stored energy.

Explore this milestone on the interactive map

What the forecast means

Milestone stage: net electric demonstration

Fusion energy gain is demonstrated in specific experiments; net plant electricity export remains unresolved

Timing window: 2031–2045. An editorial range, not a statistical confidence interval.

Completion criteria: A fusion installation exports at least 1 MWh of net electricity during a continuous 24-hour evaluation, independently metered after all plant imports and explicitly accounting for startup and stored energy. A forecast, policy target or prototype outside this definition does not resolve it.

This page describes a forecast, rather than an achieved result. Read the methodology and assumptions.